Project request and scope
Requested outputs, acceptance conditions, exclusions and document control.
Two-story office building. 18,000 SF. A complete rough-framing review from incoming request through contractor turnover.
Review the turnoverOpen the editable workbookPackage issue R1 / October 5, 2026
Requested outputs, acceptance conditions, exclusions and document control.
Assembly IDs, measurements, procurement rounding and addendum deltas.
Review the six-sheet drawing basis →Supplier conditions, unresolved scope and a cost build your team can edit.
4,641 SF measured → 5,120 SF purchasing
Q-102 / EW-01297 EA measured → 321 EA purchasing
Q-102 / ST-01780 LF measured → 848 LF purchasing
Q-102 / PL-01390 LF measured → 432 LF purchasing
Q-102 / BP-01152 EA measured → 160 EA purchasing
Q-102 / opening register3,978 SF measured → 4,384 SF purchasing
Q-102 / EW-02297 EA measured → 321 EA purchasing
Q-102 / ST-02780 LF measured → 848 LF purchasing
Q-102 / PL-02| Upper-level sheathing | Supplier A | Supplier B | Supplier C |
|---|---|---|---|
| Required / quoted panels | 137 / 137 | 137 / 128 | 137 / 137 |
| Complete amount before tax | $3,582.60 | Unavailable | $3,438.70 |
| Decision condition | Reconfirm at release | 9 panels short; substitution and delivery unresolved | One delivery included |
Pricing inputs are for review. Applicable tax and staged delivery require confirmation.
12 LF of bearing wall added. 120 SF of floor opening added. Two roof curbs added. The workbook preserves both measurement bases and carries the changes through the current estimate.